Power Systems

UPS systems: uninterruptible power supply solutions

A pure sine wave, 100% isolation and switchover to battery with zero transfer time, thanks to Online Double Conversion technology.

Technical Specifications

Industrial-grade protection

Designed for server rooms, production lines and critical infrastructure.

Choosing the right uninterruptible power supply (UPS) is critical for systems that cannot tolerate a power cut, such as companies running server rooms, manufacturing facilities working with PLC and automation systems, laboratories and security camera infrastructure. We measure your load, calculate the required kVA capacity and battery runtime, and select a vendor-neutral device to fit your needs.

Output Voltage
220V / 50Hz
Transfer Time
0 ms
Efficiency
≥ 96%
Capacity Range
1–200 kVA
Output Stabilisation
Pure Sine Wave
220V
Voltage
50Hz
Frequency
≤ 1%
THD
Capabilities

Complete protection for critical infrastructure

Double Conversion

Full isolation from the mains through AC → DC → AC conversion.

0 ms Transfer

Instant switchover to battery when mains power fails; systems stay on.

Smart Charging

Adaptive charging algorithms that extend battery life.

Modular Power

Parallel UPS configurations that scale with your needs.

Scope of Service

How does a UPS project progress?

A planned process in four steps, from load measurement to periodic maintenance.

01

Site survey and load measurement

We list the devices to be protected and measure current consumption, and inspect the electrical panel, earthing and ventilation of the area where the UPS will be installed on site.

02

Capacity and topology selection

The kVA rating and battery bank are calculated from the total load, growth margin and required battery runtime; a single, parallel or modular set-up is chosen.

03

Installation and commissioning

Panel connections, the maintenance bypass arrangement and battery cabinets are installed; an outage scenario is tested to verify switchover to battery and monitoring notifications.

04

Periodic maintenance and support

Battery health measurements and device checks are carried out regularly. One year of free maintenance on enterprise projects, followed by SLA-based 24/7 support.

FAQ

Frequently asked questions about choosing and installing a UPS

The power consumption of all devices to be connected to the UPS is added up, converted into kVA taking the power factor into account, and a growth margin is left for devices to be added later. Since nameplate ratings often differ from actual consumption, we believe measuring the load during the site survey gives a more accurate result. The battery bank is then sized according to the required battery runtime.

Secure your power infrastructure